In October – November 2024 PT. Prajania Segara Utama conducted a Positioning survey, Anchor work at Widuri Terminal, PHE Oses.
Contractor : PT. Fabila Teknik Sejahtera – PHE ONWJ





In October – November 2024 PT. Prajania Segara Utama conducted a Positioning survey, Anchor work at Widuri Terminal, PHE Oses.
Contractor : PT. Fabila Teknik Sejahtera – PHE ONWJ
In November 2024 PT. Prajania Segara Utama has conducted a Bathymetric Survey of Shipping Lanes which took place in Tuban using multibeam echosounder and sidescan sonar.
Contractor : PT. Trans Pacific Petrochemical Indotama
For approximately 1 month, in September PT. Prajania Segara Utama continued the geophysical survey task for pipe inspection in the Sukowati Tuban Field.
Contractor : PT. Aquamarine Divindo Inspection – Pertamina EP
In July – August, PT. Prajania Segara Utama was again given the task to conduct a survey related to Geophysics to update the current condition of 13 freespan pipes, debris, crossings, and other objects in WMO – Poleng Field, Madura.
Contractor : PT. Aquamarine Divindo Inspection – PHE WMO
In July – August 4, PT. Prajania Segara Utama was entrusted to work on Complete Geophysical Survey for
mapping subsea pipeline at Pulau Baai, Bengkulu.
Contractor : PT. Fabila Teknik Sejahtera – Pertamina Maintance & Construction
On June 27 – July 17, 2024, PT Prajania Segara Utama conducted a bathymetric survey and metocean survey in Jenepoto, South Sulawesi.
Contractor : PT. Buwana Kreasi International
Still in May 2024 PT. Prajania Segara Utama conducted a survey of the position of the Assist diver during the installation of SPM and replacement of mooring chains at SPM Shafi II, Cengkareng.
Contractor : PT. Jaya Marlin Persada
In April to May PT. Prajania Segara Utama is trusted to carry out Positioning surveys, Anchor work and Assist underwater positioning for divers at the PHE OSES Widuri Terminal.
Contractor : PT. Fabila Teknik Sejahtera – PHE OSES
In May 2024 PT. Prajania Segara Utama has carried out a Geophysical Survey to update the current condition of 2 freespan pipes, debris, crossings and other objects in Gresik, East Java for 20 days.
Contractor : PT. Fabila Teknik Sejahtera – PHE WMO
In April 2024 PT. Prajania Segara Utama was entrusted with the Bathymetry Survey Positioning Mooring Buoy and Work Barge at Jambi Fuel Terminal Pier which lasted for 4 days.
Contractor : PT. Pertamina Marine Engineer Jambi