On May 2024 – PT. Prajania Segara Utama conducted a survey of the position of the Assist diver during the installation of SPM and replacement of mooring chains at SPM Shafi II, Cengkareng.
Contractor : PT. Jaya Marlin Persada




On May 2024 – PT. Prajania Segara Utama conducted a survey of the position of the Assist diver during the installation of SPM and replacement of mooring chains at SPM Shafi II, Cengkareng.
Contractor : PT. Jaya Marlin Persada