Provision of Positioning and Survey CPP-PLEM Pipeline Repair

Provision of Positioning and Survey CPP-PLEM Pipeline Repair

On February 13th to February 26th 2026 – PT. Prajania Segara Utama had successfully performed a position mapping survey inspection using DGPS Hemisphere VS1000 and Underwater positioning using USBL Mini Ranger 2 system for pipeline position determination during the platform operations for the repair of Pipeline 8 CPP-PLEM, using dynamic positioning at AHTS. Logindo Sturdy in Bawean Island, Gresik, East Java. Contractor: PT. Prima Energy.

Provision of Positioning and Survey During CPP-PLEM Pipeline Repair and Reover Messenger Line

Provision of Positioning and Survey During CPP-PLEM Pipeline Repair and Reover Messenger Line

On December 22nd 2025 to January 15th 2026 – PT. Prajania Segara Utama had successfully performed a position mapping survey inspection using DGPS Hemisphere VS1000 and Underwater positioning using USBL Mini Ranger 2 system for pipeline position determination during the platform operations for the repair of Pipeline 8 CPP-PLEM, using dynamic positioning at AHTS. Etzomer 1601 DP2 in Bawean Island, Gresik, East Java. Contractor: PT. Prima Energy.

Provision of Certification, Underwater Inspection and Structural Leg

Provision of Certification, Underwater Inspection and Structural Leg

On November 8th to November 23th 2025 – PT. Prajania Segara Utama had successfully completed positioning survey for project Provison of Certification, Underwater Inspection and Structural Leg Cleaning for KH Platform & KRA Platform, online during operation with USBL HPT3000, Sonardyne WSM 6G, TSS Gyrocompass, GPS Hemisphere VS1000, TSS DMS-05 in Kakap Natuna Field. Contractor : PT. Artha Asia Solusindo Client : Star Energy.

Positioning Relocation EPC of SPM 35,000 DWT at Balongan

Positioning Relocation EPC of SPM 35,000 DWT at Balongan

On April 23rd to June 9th 2025 – PT Prajania Segara Utama has successfully completed the pipe flushing stage to clean the pipeline, which was continued with the release of floating hoses, mooring hawsers, and underwater hoses. After that, the process of breaking the chain and pulling the Single Point Mooring (SPM) was carried out, including the release and wiring of the SPM chain from the seabed. replacement of the old PLEM to the new one complete using positioning support with USBL and beacons. The progress of system testing such as hydrotest, gravity test, and dewatering has been completed at Balongan, West Java. Contractor : PT Fabila Teknik Sejahtera, Client : PT. Kilang Pertamina Internasional.