EPCI Contract of Pipeline (PipelineTerminal Phase 2, EBEPRO, LES-KLB)

EPCI Contract of Pipeline (PipelineTerminal Phase 2, EBEPRO, LES-KLB)

April 2, 2024July 21, 2025 by prajania Comment Closed

On April 2024 – PT. Prajania Segara Utama conducted a Geophysical Survey to update 2 pipelines with a 500 m corridor before installing the pipeline in the Echo – NGL Field, ONW Contractor: PT. Hafar Daya Konstruksi, Client: PHE ONWJ.

Newsnews, prajania
HDPE Pipe Removal

HDPE Pipe Removal

March 29, 2024July 21, 2025 by prajania Comment Closed

On March 2024 – PT. Prajania Segara Utama conducted a survey for the placement of HDPE pipe installation with ROV support and diving during the removal of HDPE pipe in Nusa Tenggara. Contractor : PT. Warma Trierindo, Client: AMMAN.

Newsnews, prajania
Seabed Survey in Bangka Strait

Seabed Survey in Bangka Strait

January 8, 2024July 21, 2025 by prajania Comment Closed

On January 2024 – PT. Prajania Segara Utama survey the seabed to determine and update the current condition of the debris after the transfer of the MV in Bangka. Contractor : PT. Indotama Maritime Services, Client : Guangzhou Salvage.

Newsnews, prajania
Topographic Surveyfor Calibration Batam-Riau Island

Topographic Surveyfor Calibration Batam-Riau Island

December 21, 2023July 21, 2025 by prajania Comment Closed

On December 18th to 20th 2023 – PT. Prajania Segara Utama calibrates the ship using a total station. SCN Nongsa Port, Batam. Contractor : PT. Hidronav Tehnikatama, Client : PT. Elnusa.

Newsnews, prajania
Subsea Pipeline 16 inch Inspection and Maintenance Services

Subsea Pipeline 16 inch Inspection and Maintenance Services

November 30, 2023July 21, 2025 by prajaniaNo Comments

On October to November 30th 2023 – PT. Prajania Segara Utama provided diver support during inspection activities to determine pipe positions, perform pipe maintenance, and monitor the position of the mother ship and divers during the work in the waters of Surabaya, East Java. Contractor: PT. Aquamarine Divindo Inspection, Client: PHE WMO.

Newsnews, prajania
Positioning System forTightening Bolt of 16″Pipeline PPP-ORF KP64.5

Positioning System forTightening Bolt of 16″Pipeline PPP-ORF KP64.5

November 22, 2023July 21, 2025 by prajaniaNo Comments

On October 2023 – PT. Prajania Segara Utama supports the positioning of vessels and divers for maintenance and bolt tightening on the 16″ PPP-ORF KP 64.5 pipeline system at Gresik, East Java. Contractor: PT. Titis Sampurna Inspection, Client: PHE WMO.

Newsnews, prajania
Pipeline Geophysical Leak Survey

Pipeline Geophysical Leak Survey

September 28, 2023July 21, 2025 by prajania Comment Closed

On September 2023 – PT. Prajania Segara Utama conducted a Geophysical Survey for the Maintenance of the 14’’ MGL CPP – ORF and 16’’ MGL PPP – ORF Pipeline Projects using MBES EM-2040C and Sidescan Sonar C-MAX CM2 at Gresik, East Java. Contractor : PT. Titis Sampurna Inspection, Client : PHE WMO.

Newsnews, prajania
Positioning Survey

Positioning Survey

September 7, 2023July 21, 2025 by prajania Comment Closed

On July 4th to September 2023 – PT. Prajania Segara Utama conducted a position survey for the installation of Pre-Lay Grapnel Run (PLGR) and Pre-Lay Cutting Run (PLCR) cables at Java Sea. Contractor: PT. DAB Nusantara.

Newsnews, prajania
Positioning Survey Replacement SBM Project

Positioning Survey Replacement SBM Project

August 20, 2023July 21, 2025 by prajania Comment Closed

On July 28th to August 18th 2023 – PT. Prajania Segara Utama conducted a positioning survey for the Replacement of SBM Project Assist Positioning AWB kingfisher and AHT Patrona, Assisting underwater positioning for divers at Widuri Terminal. Contractor : PT. Fabila Teknik Sejahtera, Client : PHE OSES.

Newsnews, prajania
Positioning Survey for Mixed Gas Diving Support HCML Project

Positioning Survey for Mixed Gas Diving Support HCML Project

June 29, 2023July 21, 2025 by prajania Comment Closed

On June 23 2023 – PT. Prajania Segara Utama fully supports the survey to determine the position of the vessel and divers during the underwater gas valve opening process, which took place at HCML’s MAC Field. Contractor : PT. Aquamarine Divindo Inspection, Client : HCML.

Newsnews, prajania

Posts pagination

Previous 1 … 3 4 5 … 10 Next
About Us
Experiences
  • Bathymetry Survey Post-Salvage MT. Silver
  • Regular Survey of the Elevation of CW Intake Pipe (Offshore) Manholes and Seabed 3rd
Contact Us
  • 021-5999-2693 / 0812-2606-3000
  • info@prajaniasurvey.com
  • prajaniasurvey.com
  • Ruko Mandrisio Square, no.21, Jalan Boulevard Raya, Gading Serpong, Cihuni, Pagedangan, Tangerang, Banten 15332

Get in Touch

Email Us : info@prajaniasurvey.com

  • Instagram
  • LinkedIn