On July 4th to September 2023 – PT. Prajania Segara Utama conducted a position survey for the installation of Pre-Lay Grapnel Run (PLGR) and Pre-Lay Cutting Run (PLCR) cables at Java Sea. Contractor: PT. DAB Nusantara.




On July 4th to September 2023 – PT. Prajania Segara Utama conducted a position survey for the installation of Pre-Lay Grapnel Run (PLGR) and Pre-Lay Cutting Run (PLCR) cables at Java Sea. Contractor: PT. DAB Nusantara.



