Provision of Certification, Underwater Inspection and Structural Leg

Provision of Certification, Underwater Inspection and Structural Leg

On November 8th to November 23th 2025 – PT. Prajania Segara Utama had successfully completed positioning survey for project Provison of Certification, Underwater Inspection and Structural Leg Cleaning for KH Platform & KRA Platform, online during operation with USBL HPT3000, Sonardyne WSM 6G, TSS Gyrocompass, GPS Hemisphere VS1000, TSS DMS-05 in Kakap Natuna Field. Contractor : PT. Artha Asia Solusindo Client : Star Energy.

Positioning Relocation EPC of SPM 35,000 DWT at Balongan

Positioning Relocation EPC of SPM 35,000 DWT at Balongan

On April 23rd to June 9th 2025 – PT Prajania Segara Utama has successfully completed the pipe flushing stage to clean the pipeline, which was continued with the release of floating hoses, mooring hawsers, and underwater hoses. After that, the process of breaking the chain and pulling the Single Point Mooring (SPM) was carried out, including the release and wiring of the SPM chain from the seabed. replacement of the old PLEM to the new one complete using positioning support with USBL and beacons. The progress of system testing such as hydrotest, gravity test, and dewatering has been completed at Balongan, West Java. Contractor : PT Fabila Teknik Sejahtera, Client : PT. Kilang Pertamina Internasional.

Bathymetric and Geophysical Survey Sepanjang Island

Bathymetric and Geophysical Survey Sepanjang Island

On January 2025 – PT. Prajania Segara Utama successfully completed a comprehensive seabed topographic and bathymetric survey, along with an underwater inspection of the anchor and chain systems within the designated survey area accurately identify the FSO mooring system around Sepanjang Island. Contractor : PT. MGA Utama Energi, Client : PT. Jasa Maritim Services Indotama.