Skip to content
  • Home
  • About us
  • Survey Services
    • Positioning Service
    • Geophysical Service
    • Freespan Survey
    • Topographic Service
    • Meteorology and Oceanographic Service
  • Experiences
  • Meet Our Team
  • Contact Us

Tag: prajania

SPM Shafthi IIInstallation After Dry Docking and Mooring Chain Replacement

SPM Shafthi IIInstallation After Dry Docking and Mooring Chain Replacement

May 20, 2024July 21, 2025 by prajania Comment Closed

On May 2024 – PT. Prajania Segara Utama conducted a survey of the position of the Assist diver during the installation of SPM and replacement of mooring chains at SPM Shafi II, Cengkareng. Contractor : PT. Jaya Marlin Persada, Client : PT. Pertamina.

Newsnews, prajania
Subsea Pipeline Repair

Subsea Pipeline Repair

May 18, 2024July 21, 2025 by prajania Comment Closed

On April to May 2024 – PT. Prajania Segara Utama is trusted to carry out Positioning surveys, Anchor work and Assist underwater positioning for divers at the PHE OSES Widuri Terminal. Contractor : PT. Fabila Teknik Sejahtera, Client : PHE OSES.

Newsnews, prajania
Geophysical Survey for16” MGL PP – ORF and14’ MGL CPP – ORFPipeline

Geophysical Survey for16” MGL PP – ORF and14’ MGL CPP – ORFPipeline

May 16, 2024July 21, 2025 by prajania Comment Closed

On May 2024 – PT. Prajania Segara Utama has carried out a Geophysical Survey to update the current condition of 2 freespan pipes, debris, crossings and other objects in Gresik, East Java for 20 days. Contractor : PT. Fabila Teknik Sejahtera, Client : PHE WMO.

Newsnews, prajania
Survey Bathymetry for Positioning Mooring Buoy and Work Barge

Survey Bathymetry for Positioning Mooring Buoy and Work Barge

April 5, 2024July 21, 2025 by prajania Comment Closed

On April 2024 – PT. Prajania Segara Utama was entrusted with the Bathymetry Survey Positioning Mooring Buoy and Work Barge at Jambi Fuel Terminal Pier which lasted for 4 days. Contractor : PT. Pertamina Marine Engineer Jambi.

Newsnews, prajania
EPCI Contract of Pipeline (PipelineTerminal Phase 2, EBEPRO, LES-KLB)

EPCI Contract of Pipeline (PipelineTerminal Phase 2, EBEPRO, LES-KLB)

April 2, 2024July 21, 2025 by prajania Comment Closed

On April 2024 – PT. Prajania Segara Utama conducted a Geophysical Survey to update 2 pipelines with a 500 m corridor before installing the pipeline in the Echo – NGL Field, ONW Contractor: PT. Hafar Daya Konstruksi, Client: PHE ONWJ.

Newsnews, prajania
HDPE Pipe Removal

HDPE Pipe Removal

March 29, 2024July 21, 2025 by prajania Comment Closed

On March 2024 – PT. Prajania Segara Utama conducted a survey for the placement of HDPE pipe installation with ROV support and diving during the removal of HDPE pipe in Nusa Tenggara. Contractor : PT. Warma Trierindo, Client: AMMAN.

Newsnews, prajania
Seabed Survey in Bangka Strait

Seabed Survey in Bangka Strait

January 8, 2024July 21, 2025 by prajania Comment Closed

On January 2024 – PT. Prajania Segara Utama survey the seabed to determine and update the current condition of the debris after the transfer of the MV in Bangka. Contractor : PT. Indotama Maritime Services, Client : Guangzhou Salvage.

Newsnews, prajania
Topographic Surveyfor Calibration Batam-Riau Island

Topographic Surveyfor Calibration Batam-Riau Island

December 21, 2023July 21, 2025 by prajania Comment Closed

On December 18th to 20th 2023 – PT. Prajania Segara Utama calibrates the ship using a total station. SCN Nongsa Port, Batam. Contractor : PT. Hidronav Tehnikatama, Client : PT. Elnusa.

Newsnews, prajania
Subsea Pipeline 16 inch Inspection and Maintenance Services

Subsea Pipeline 16 inch Inspection and Maintenance Services

November 30, 2023July 21, 2025 by prajaniaNo Comments

On October to November 30th 2023 – PT. Prajania Segara Utama provided diver support during inspection activities to determine pipe positions, perform pipe maintenance, and monitor the position of the mother ship and divers during the work in the waters of Surabaya, East Java. Contractor: PT. Aquamarine Divindo Inspection, Client: PHE WMO.

Newsnews, prajania
Positioning System forTightening Bolt of 16″Pipeline PPP-ORF KP64.5

Positioning System forTightening Bolt of 16″Pipeline PPP-ORF KP64.5

November 22, 2023July 21, 2025 by prajaniaNo Comments

On October 2023 – PT. Prajania Segara Utama supports the positioning of vessels and divers for maintenance and bolt tightening on the 16″ PPP-ORF KP 64.5 pipeline system at Gresik, East Java. Contractor: PT. Titis Sampurna Inspection, Client: PHE WMO.

Newsnews, prajania

Posts pagination

Previous 1 2 3 4 … 9 Next
About Us
Experiences
  • Regular Survey the Elevation of CW Intake Pipe (Offshore) Manholes and Seabed PLTU Batang
  • Positioning Survey Rig Move
Contact Us
  • 021-5999-2693 / 0812-2606-3000
  • info@prajaniasurvey.com
  • prajaniasurvey.com
  • Ruko Mandrisio Square, no.21, Jalan Boulevard Raya, Gading Serpong, Cihuni, Pagedangan, Tangerang, Banten 15332

Get in Touch

Email Us : info@prajaniasurvey.com

  • Instagram
  • LinkedIn